MASJEDSOLEYMAN dam and water power plant (Gadarlender)

MASJEDSOLEYMAN dam and water power plant (Gadarlender)

They are one of the tallest dam valves in the world and have a height of 23.5 meters and a width of 13.5 meters, and each of them weighs 270 tons. The valve shell is made in 6 pieces in the Arak machinery factory and then these parts are assembled and welded together

More Information
The KARUN Bridge

The KARUN Bridge

The installation of this bridge for the first time, despite the height and difficulty of the installation site and the length of the arch, was successfully installed by the Arak Engineering and Construction Machinery Company on the Karun River and a valley 250 meters deep

More Information
Spherical tanks

Spherical tanks

Civil operations and structures and building, as well as installation of 6 spherical tanks with a capacity of 9000 cubic meters in different capacities and 12 storage tanks, which are 4 fixed roof and 8 floating roof, along with piping, fire extinguishing system, installation of mechanical equipment including (pumps, drums, heat exchangers, compressors, etc.) electrical operations and precise instruments, insulation and other operations totaling approximately 34,000 tons

More Information
Cement factory

Cement factory

Construction of cyclones of hot air peri-heteroducts

More Information
Two decades of activity

Two decades of activity

Arak Machinery Engineering and Construction Company was formed from the merger of Arak Machinery Installation and Commissioning Group and Gostar Installation Company, one of the companies affiliated to the Organization of Industrial Development and Modernization of Iran. It is registered and independent. This company, in the form of the installation and commissioning group of Arak Machinery Company, has been implementing huge industrial and construction projects inside and outside the country for many years, some of these projects are mentioned in this collection

More Information